Tags: Biomass, Docks, EIA, Energy, Forth, Planning, Ports, Regeneration
It would be great to see Edinburgh generate it's own power in a very low carbon way such as this. But to put this monster (65metre high building with 100m high tower) between the city (residents are only 200metres away) and the seaside seems to be blighting the whole area.
There are also railway lines a few hundred metres away. The plant needs 1.3 million tonnes of woodchip every year. If 70% arrives by ship then that leaves nearly 400thousand tonnes to arrive by lorry. How much can one lorry carry - how many trips is this?
Section 3.3.1 on page 14 seems to be about power generation but the paragraph is unreadably unclear and needs clarification.


Dear all,
Forth Energy have revised their site plan. You can see blog post about it here:
http://www.greenerleith.org/greener-leith-news/2010/3/12/biomass-pl...
© 2010 Created by Greener Leith
Powered by
.